Contract Awarded For Repairs to Kirkfield Lift Lock

Kirkfield Lock

Feb 7, 2023

On September 2 last year, Lock 36, the Kirkfield Lift Lock suffered a mechanical failure, resulting in the site’s closure for the remainder of the 2022 navigation season.

As of late January, Parks Canada advises that a contract has been awarded to undertake repairs to return the site to full service.

The scope of work will include;

• Repairs to the structural, mechanical and electrical components.
• System improvements to increase safety controls and access improvements to critical system components.
• Backup system improvements to minimize impacts on future maintenance activities.

Kirkfield Lock Map

 

The contractor will mobilize to the site in the near future with the goal of having the asset fully operational by the beginning of the 2023 navigation season.

In order to aid with trip planning for boaters and land-based visitors for the 2023 season, updates on the progress can be found on the Parks Canada website.

Updates will also be provided via email on a regular basis to interested parties as part of an email subscriber list. If you would like to receive these emails, please contact  trentsevern@pc.gc.ca and include “Kirkfield Lift Lock” in the subject line.

 

Related Articles


ENVGO NV1: Back to the Future

By Andy Adams

Up to this point, I feel that most electric boats have not been very exciting. The motors have been mainly small portable models for dinghies. There are some high-horsepower motors available, but they look like regular outboard motors to be used on conventional boats. Until now, there hasn’t been an electric boat that really makes a statement. Enter the ENVGO NV1.

Read More


Destinations

Canada’s Superior: the North Shore

Story and photos by Jennifer M. Smith

We’d been north before on a short two-week cruise. At the time, we were unprepared for the isolation, the lack of cell phone coverage, and the spotty VHF reception. Since then we’ve repowered, installed Starlink, and retired from work. Now, with confidence in our engine and our connectivity and more time to sail, we were Superior-ready.


Read More